Some studies in machine learning using the game of Checkers · PDF

kaynak: jeo.kompas.com
PDF görünümü Sayfa metni Paylaş Orijinal PDF ↗
/ 20

SAYFA 10 / 20

544 Improving the Efficiency of a Problem Solver hie to attach greater weight to situations leading to large double corners is an example. Twenty-seven tlilferent values of tlelta. Accortlingly, two atltlitional categories simple terms are now in use, the rest being com hi national are ddinetl. If a contrihution to tlelta is matle hy the first terms. as will he described later. term. meaning that a change has occurred in the piece A word might be said about these terms with respect ratio. the indicatetl changes in the correlation coetlicients to the exact' way in which they arc definetl and the arc tloubled, while .if the value of tlelta is so large as to general procedures used for their evaluation. Each term indicate that an almost sure win or lose will result. the relates to the relative standi~gs of the two sides. with elfect on the correlation"~oefficientsis quadrupled. respect to the parameter in question, and it is numeri- cally equal to the difference hetween the ratings for the • Term replacemellt individual sides. A reversal of the. sigh obviously cor- ;\o[ention has been made several times of the procedure responds to a change of sides. As a further means of for replacing terms in the scoring polynomial. The pro- insuring symmetry the individual ratings of the respec- gram. as it is currently running, contains 38 different tive sides are determined at corresponding times in the terms (in addition to the piece-advantage term), 16 of playas viewed by the side in question. for example, ·these being included in the scoring polynomial at anyone consider a parameter which relates to the board condi- time and the remaining 22 being kept in reserve. After tions as left after one side has moved. The rating of each move a low-term tally is recorded against that active Black for such a parameter would be made after Black term which has the lowest correlation coefficient and, at had moved, and the rating of White would not be made the same time, a test is made to see if this brings its tally until after White had moved. During anticipation play, count up to some arbitrary limit, usually set at 8. When these individual ratings are made after each move and this limit is reached for any specific term. this term is saved for future reference. When an evaluation is de- transferred to the bottom of the reserve list, and it is re- sired the progrm)1 takes the differences between the most . placed by a term from the head of the reserve Jist. This recent ratings and those mane a move earlier. In general, new term enters the polynomial with zero values for an attempt has been made to define all parameters so its correlation coefficient. times used, and low-tally that the individual-side ratings are expressible as small count. On the average, then, an active term is replaced positive integers. once each eight moves and the replaced terms are given • Binary connecti!'e terms another chance after 176 moves. As a check on the ef- fectiveness of this procedure, the program reports on In addition to the simple terms of the type just described, the usage which has accrued against each discarded term. a number of combinational terms have been introduced. Terms which are repeatedly rejected after a minimum Without these terms the s.~oring polynomial would, of amount of usage can be removed and replaced with com- course, be linear. A number of different ways of intro- pletely new terms. ducing nonlinear terms have been devised but only one It might be argued that this procedure of having the of these has been tested in any detail. This scheme pro- program select terms for the evaluation polynomial from vides terms which have some of the properties of binarv a supplied list is much too simple and that the program logical connectives. Four such terms are formed fo'r should generate the terms for itself. Unfortunately, no each pair of simple terms which are to be related. This satisfactory scheme for doing this has yet been devised. is done by making an arbitrary division of the range in With a man-generated list one might at least ask that values for each of the simple terms and assigning the the terms be members of an orthogonal set, assuming binary values of 0 and 1 to these ranges. Since most of that this has some meaning as applied to the evaluation the simple terms are symmetrical about 0, this is easilv of a checker position. Apparently, no one knows enough done on a sign basis. The new terms are then of th~ about checkers to define such a set. The only practical form A-B, A-B, A-B. and A-8, yielding values either of' solution seems to he that of including a relatively large o or I. These terms are introduced into the scorina number of possible terms in the hope that all of the polynomial with adjustable coefficients and si!.!ns, and contributing parameters get covered somehow, even are thereafter indistinguishable from the other t~rms. though in an involved and redundant way. This is not As it would require some 1404 such combinational an undesirable state of atfairs, however, since it simulates terms to interrelate the 27 simple terms originallv used. the situation which is likely to exist when an attempt is it was fountl desirable to limit the actual nlln~ber of made to apply similar learning techniques to real-life combinational terms used at anyone time to a small situations. fraction of these and to introduce new terms onlv as it :-'1any of the terms in the existing list arc related in became possible to retire older inetfectual tcrm~. The some vague way to the parameters used by checker ex- terms actually used are given in Appendix C. perts. Some of the concepts which checker experts appear to use have elutled the writer's attempts at defi- • Preliminary leamiflg-hy-geflerali;;ariofl tests nition, and he has heen unable to program them. Some An idea of the learning ability of this procedure can he of the terms are quite unrelated to the usual checker gained by analyzing an initial test series of 28 !.!amesUl lore and have been discovered more or less by accident. played with the program just described. At the ~tart an The second moment ahout the diagonal axis through the arbitrary selection of 16 terms was chosen and all terms -